Industries · Building materials
One System From Plant to Depot to Site
For manufacturers and distributors of building materials: production, depot stock, dealer orders and project supply in one system, with dispatch and freight recorded.
What Gets in the Way
- Sales headDepots out of step
One depot runs short while another holds the same material.
- CFODealer exposure
Dealer receivables grow because the next order ships before the last one is paid.
- LogisticsSite deliveries by phone
Project deliveries are arranged on calls, and freight is recorded later.
Building Materials, from Plant and Depot to Dealer and Site
Steps in the same column run in parallel. Copper steps are control points. Select a step to see its document, who acts and the control.
01 · Dealer or project order
- Document
- Sales order
- Who acts
- Sales
- Control
- Dealer price list and project rates applied
- 1SalesDealer or project orderDealer price list and project rates applied
- 2Credit controlCredit checkOrders over the limit wait for approval
- 3DepotDepot availabilityWhat each depot holds and has on the way
- 4Depotin parallelAllocate and pickPicked against the order
- 5Plantin parallelProduction and replenishmentDepots replenished from the plant plan
- 6LogisticsDispatch to dealer or siteFreight captured against the dispatch
- 7Credit controlInvoice and collectionDealer receivables followed before the next order ships
Read the steps as text
- Dealer or project order (Sales). Sales order; Dealer price list and project rates applied.
- Credit check (Credit control). Dealer credit position; Orders over the limit wait for approval.
- Depot availability (Depot). Stock by depot; What each depot holds and has on the way.
- Allocate and pick (Depot). Picking list; Picked against the order.
- Production and replenishment (Plant). Work order, stock transfer; Depots replenished from the plant plan.
- Dispatch to dealer or site (Logistics). Delivery note, e-way bill, freight; Freight captured against the dispatch.
- Invoice and collection (Credit control). Invoice, receipt; Dealer receivables followed before the next order ships.
Three controls that matter most
Where Margin Is Won or Lost
- Depot stockWhat each depot holds and what is on the way.
- Dealer receivablesExposure by dealer, before the next order ships.
- Dispatch and freightDeliveries to depots, dealers and sites, with their cost.
Modules involved
What You Would Use
Bring Us One Live Process
Pick the process that costs you most today. We will walk through it with your documents and show it running in Milestone.
Questions buyers ask
Can depots be replenished from the plant plan?
Yes. Stock transfers move material from plant to depot and are tracked in transit.
Can dealer and project orders run side by side?
Yes. Both are sales orders with their own price lists, credit terms and delivery points.